Posted 01/12/2020
Turner Power Generation were required to supply, install and commission 1 x 598 kVA diesel generating set, including a G59 control upgrade enabling the generator to participate in DSR.
Learn MorePosted 30/11/2020
The contract was for the removal of a temporary hire generator and the installation and commissioning of a new FG Wilson P800 generator into Tesco’s Oakwood Distribution Centre, which is a critical location in their distribution operations.
Learn More